78704

Published on March 18th, 2014 | by Editor

Major Improvements Underway at Auditorium Shores (PHOTOS)

The Auditorium Shores area is undergoing a series of improvement projects that will transform the look of the area and improve the park’s ability to host large outdoor events. The hike and bike trail that runs through this area will remain open during construction, with detours provided when necessary. Construction started in December 2013 and will be completed in phases as seen in the graphics below.

The Trailhead

According to the City of Austin, upgrades at the Trailhead area will create “a more resilient parkland setting for daily use and special events.” Funding for the trailhead comes from the State of Texas and the City of Austin, each paying for half of the $2M total cost. This area is set to reopen to the public by August.

Auditorium Shores Improvements

Funded by a $3.5M donation from C3 Events (organizer of the Austin City Limits Music Festival), the improvements at Auditorium Shores “will bring a renewed focus on this facility as a great urban park that can sustainably accommodate patrons, special events and community gatherings.” When complete, expect to see newly designed and developed off-leash area, realignment of the trail, irrigation and new turfgrass for the event lawn, and a revamped shoreline.

What do you think of the upgrades going on at Auditorium Shores? Leave your comments below.

If you enjoyed this post, please consider leaving a comment or sharing with your Facebook and LinkedIn networks!
( 341 / 1 )

BuildingATX.com is supported by:

Comments

comments

Tags: , , , , , , ,


About the Author

Kelly D. is a local engineering and construction professional and the editor of BuildingATX.com. In his day job, he is currently overseeing several construction projects across greater Austin. His postings on this site are his own and do not represent his employer’s positions, strategies, or opinions. You can reach him at [email protected]



Comments are closed.

Back to Top ↑